I finished the top and decided to make a couple pillow shams. I'm still not sure, but might put another row of border neutral squares around the quilt top.
Finally got the binding on this quilt.
I guess I still need to get a pic with the binding.
1/20/2017
1/07/2017
En Provence
After sewing all the blocks, I put them on the design floor.
I arranged them to my liking and started webbing the top.
Yesterday I got the main part of the quilt webbed.
Hope to get it all sewn together today.
En Provence progress click herehttp://quiltville.blogspot.com/2017/01/mystery-monday-link-up-part-6-7.html
I arranged them to my liking and started webbing the top.
Yesterday I got the main part of the quilt webbed.
Hope to get it all sewn together today.
En Provence progress click herehttp://quiltville.blogspot.com/2017/01/mystery-monday-link-up-part-6-7.html
1/05/2017
En Provence
I've been working on my En Provence quilt. These are some of the pieces.
I finished clue 7.
I decided to put the blocks together a little differently. The 15 inch block was a little to confusing to me. So I put mine together as smaller blocks like this
I webbed all my blocks, making sure that half of those purple center 4 patches leaned to the right and half leaned to the left.
I finished clue 7.
I decided to put the blocks together a little differently. The 15 inch block was a little to confusing to me. So I put mine together as smaller blocks like this
I webbed all my blocks, making sure that half of those purple center 4 patches leaned to the right and half leaned to the left.
Subscribe to:
Posts (Atom)